View Post

Valencia Water Control District, Soil Stabilization

In Commercial Blog Posts, Commercial Projects, Featured Projects, Soil Stabilization by John Topa

Valencia Water Control District, Orlando, FLOrlando, FLCLIENT: Stormwater Infrastructure Engineer MARKET: Commercial SOLUTION: Soil Stabilization SERVICES: Permeation Grout Improve soil strength and dam stabilityProject PDFProjectThis case study details Helicon’s successful application of permeation grouting to address soil erosion concerns at a water dam project for the Valencia Water District in Orlando, Florida.ChallengeThe Valencia Water District identified a critical issue with …

View Post

Residential Pool Deck Stabilization, Tampa, FL

In Commercial Blog Posts, Commercial Projects, Featured Projects, Ground Improvement, Poly Foam Grout by John Topa

Residential Pool , Tampa, FLTampa, FLCLIENT: Homeowner MARKET: Residential SOLUTION: Ground Improvement SERVICES: Helical Piers,  Chemical Grout  Secure and stabilize pool deck of existing residential pool.Project PDFProjectA residential pool deck was experiencing settlement and needed to be stabilized.Challenge• Loose soils underneath pool deck structure.Solution25 injection points to install a chemical polyurethane expanding foam grout around the pool deck. 9 Helical …

View Post

Trammell Crow, Tampa, FL, Ground Improvement

In Commercial Blog Posts, Commercial Projects, Compaction Grout, Featured Projects, Ground Improvement by John Topa

Trammell Crow Residential, Tampa, FLTampa, FLCLIENT: Trammel Crow Residential MARKET: Commercial SOLUTION: Ground Improvement SERVICES: Compaction Grout  Increase Load Bearing Capacity of Loose Soils for 300 Unit Apartment ComplexProject PDFProjectThe 13.5 Acre project site at Trammell Crow Uptown Development where the former Grand Prix Tampa on N Nebraska Ave, Tampa was located.Challenge• The entire project area of the former go-kart …

View Post

TIA Logistics Center, Tampa, FL, Ground Improvement

In Commercial Blog Posts, Commercial Projects, Compaction Grout, Featured Projects, Ground Improvement by John Topa

TIA Logistics Center, Tampa, FLTampa, FLCLIENT: TIA Logistics Center MARKET: Commercial SOLUTION: Ground Improvement SERVICES: Compaction Grout  Increase Load Bearing Capacity of Loose SoilsProject PDFProjectThe TIA Logistics Center Warehouse was in need of ground improvement due to loose and sandy soils. Challenge• The entire project area needed to have load bearing capacity to support heavy equipment.SolutionCompaction grout pumped into 56 injection …

View Post

Waste Management, Tampa, FL, Soil Stabilization

In Commercial Blog Posts, Commercial Projects, Featured Projects, Poly Foam Grout by John Topa

Waste Management, Tampa, FLTampa, FLCLIENT: Waste Management MARKET: Commercial SOLUTION: Soil Stabilization SERVICES: Chemical Grout  Stabilize Soil in Parking Lot for Heavy TrucksMultiple voids filled throughout the areaGarbage Trucks now reside on stable groundProject PDFProjectThe Waste Management parking lot where heavy machinery and massive garbage trucks park had numerous voids beneath the surface that couldn’t support the weight of the …

View Post

Pasco Hernando State College Project

In Commercial Blog Posts, Commercial Projects, Compaction Grout, Featured Projects, Ground Improvement by John Topa

Pasco Hernando State College ProjectNew Port Richey, FLCLIENT: Pasco Hernando St College ENGINEER: Universal Engineering MARKET: Commercial SOLUTION: Ground Improvement SERVICES: Compaction Grout  Pre-Construction Soil StabilizationOver 140 Grout Injection PointsProject PDFProjectThe project is a pre-construction soil stabilization project for a Pasco Hernando State College building. The purpose of the groutingoperation was to fill any voids that may be present near …

View Post

Little Road, Trinity, FL Sinkhole

In Commercial Blog Posts, Commercial Projects, Compaction Grout, Featured Projects, Ground Improvement, Sinkhole by John Topa

Little Road, Trinity, FL Sinkhole Trinity, FLCLIENT: Spring Haven Condo Assn. ENGINEER: Basic Engineering MARKET: Commercial SOLUTION: Ground Improvement SERVICES: Compaction Grout,                         Chemical Grout  Sinkhole repair of subsidence on roadOver 578 cubic yards compaction grout utilizedOver 6,532 lbs. chemical grout utilizedProject PDFProjectThe project is a sinkhole that opened up …

View Post

USF Research Building, Tampa, FL

In Commercial Blog Posts, Commercial Projects, Compaction Grout, Featured Projects, Ground Improvement by John Topa

USF Research BuildingTampa, FLCLIENT: University of South Florida ENGINEER: FGE Engineering MARKET: Institutional SOLUTION: Ground Improvement SERVICES: Compaction Grout  Ground Improvement for a multi-story buildingOver 100 cubic yards compaction grout utilizedProject PDFProjectThe project is a research building located on the University of South Florida campus in Tampa, FL. The research lab had wall cracks appearing and doors not opening properly. …

View Post

Moorings Condominiums, Tarpon Springs, FL

In Commercial Blog Posts, Commercial Projects, Compaction Grout, Featured Projects, Ground Improvement, Poly Foam Grout, Residential Projects by John Topa

Moorings Condominiums Tarpon Springs, FLCLIENT: Moorings Condo HOA ENGINEER: Basic Engineering MARKET: Commercial SOLUTION: Ground Improvement SERVICES: Compaction Grout, Injection Pins, Chemical Grout  Ground Improvement for a 12 building condominium complex.Over 1,400 cubic yards compaction grout, 765 injection pins, and over 18,000 lbs of chemical grout utilizedProject PDFProjectThe project is a 12 building condominium complex located on the waterfront in …

View Post

Underpinning and Chemical Grout: Multi-Use Commercial Building, Tampa, FL

In Commercial Projects, Commercial Blog Posts, Featured Projects by John Topa

The Plaza at Harbour IslandTampa, FLCLIENT: Plaza Harbour Island Condo Assoc. ENGINEER: Delta Engineering MARKET: Commercial SOLUTION: Foundation Repair SERVICE: Underpinning and Chemical GroutFoundation Repair for a Multi-Use ComplexImprovement of the clayey sands and silty soilsMicropiles installed to a 45-50 ft depth rangeProject PDFProjectThe project is a multi-use complex, including retail space and multi-level condominiums/apartments. The Geotechnical Engineer of Record …